Skip to content
Arvi Infra Logo
  • Home
  • About
  • Projects
    • Completed Projects
    • Ongoing Projects
  • ArVi RMC
  • Career
  • Contact
  • ‎+91 86985 86985

Concreting of Chafekar Chowk to Keshavnagar – Kalewadi Road Phase-2 in Ward No.18

It is 1.35 Km in Length in which 0.90 KM carriageway made with (PQC) Concrete and rest 0.450 KM carriageway made with Asphalt. The road is Designed with Optimum Carriageway width with both side pedestrians’ footpath. 0.450-meter stretch designed with “Urben Street Design concept”.

  • Company: T and T Infra Ltd
  • Client: Pimpri Chinchwad Municipal Corporation, Pune
  • Project Cost: ₹ 867 Lac
  • Date of Commencement: 28-Feb-2018
  • Date of Completion: 27-Sept-2019
  • Type of work: PQC and Asphalt Road
PrevPrevious ProjectStrengthening of Bus Docking Area near BRTS Bus Station on Sangvi-Kiwale Road
Next ProjectSubway at Govind Garden Chowk on Nashik Phata-Kiwale BRTS roadNext
Arvi Infra Logo

ArVi Infra is a leading infrastructure based company working presently in Pune region. ArVi Infra is fully licensed and registered with Government of Maharashtra.

Contact Info

  • Siddhi Prerna Complex,
    B Wing, Flat No 15, Sai Chowk, New Sangvi, Pune 411027
  • +91 86985 86985
  • [email protected]

Services

  • Earth Works
  • Protection Works
  • Asphalt / Concrete
  • Construction Supervision
  • General
Copyright © 2025 ArVi Infra