Redesign of Akurdi Railway Station to PCCOE – 18 M wide street to be Developed as per Urban Street design Guidelines (Street S4)
More than 1.00 KM length has been beautified with a 9.0-meter carriageway and 4.50-meter Pedestrian footpath at both sides of the roadway.
- Company: Ajwani Infrastructure Pvt. Ltd
- Client: Pimpri Chinchwad Municipal Corporation, Pune
- Project Cost: ₹ 802 Lac
- Date of Commencement: 09-Jan-2019
- Date of Completion: 30-Sept-2020
- Type of work: Smart City Urban Development