Subway at Govind Garden Chowk on Nashik Phata-Kiwale BRTS road
It is 26.40-meter wide & 240.00-meter length project. It contains a 15 x 4.50 meter opening for the subway with a 3.0 meter wide opening for BRTS passengers. It is Optimum opening framed structure in PCMC. It has a 1.00-meter Slab Depth.
- Company: B. K. Khose
- Client: Pimpri Chinchwad Municipal Corporation, Pune
- Project Cost: ₹ 929 Lac
- Date of Commencement: 12-Mar-2018
- Date of Completion: 28-Feb-2020
- Type of work: Subway Construction